Project Description

Commercial Social Club Installation Harlow

PROJECT DESCRIPTION: Installation of 1 x Mitsubishi Heavy Industries 10 kw ceiling cassette split system and 1 x Mitsubishi Heavy Industries 8 kw wall-mounted split system both serving the 1st floor snooker and social club, the cassette unit does the match snooker table area whilst the wall-mount does the lounge area.

We also installed a Fujitsu 8 kw wall-mounted split air conditioning system into the darts / poker suite on the first floor, and a further 2 x Fujitsu 10 kw wall-mounted split systems into the pool club on the 2nd floor.In total we provided 46 kw of cooling capacity into the club making the customers experience better, the air conditioning will be used by the client for both heating in the winter and cooling in the summer. The project was done in several stages as an when the client was ready for us to come in, we met the delivery date proposed and the client was pleased with the final end product, the client also took out a planned preventative maintenance contract for the next year ensuring the equipment stays in peak operating condition to avoid any unnecessary breakdowns.

PROJECT DATE: NOVEMBER 2016